Und hier nun ein paar Impressionen zur Fertigstellung. Dieser Tag war etwas sehr turbulent, da heute der zweite Blower-Door-Test anstand, die Montage der franz. Balkone, das Geländer im Keller und natürlich die Endabnahme.

Wednesday, August 30, 2006

Ringworm On Stomach Dime Size

blower door test-

Da bei uns machen Sachen doppelt gemacht wurden, hatten wir sogar auch zwei Blower-Door-Tests ;-) Der Erste war am 25.08.2006. Dazu auch folgendes Photo.


Bei dem sehr ernüchternden Ergebnis musste man zweifeln, ob das Haus einem schweizer Käse gleicht, oder ob der Junge Mann vielleicht noch etwas hätte über sollen ... Wir mit einem Wert von etwas über 1.5, we have not met the requirements and the "assistant to the assistant to the auditor" has shown a poor performance.

For one, he did not know which panels were part of the tester and on the other he has missed a few easy Baulöcher. These include, for example, the sewage pipe in the kitchen, which has yet to be so connected. That's pretty disgusting, if you look at a negative pressure in the house the air from the manure sewer in the house sucks :-((( Or even that one notices only the dismantling of the system that tapes are released from the isolation and red cloth in the doorway was not right.

The second test was on 31.08.2006. We quickly realized the difference between the "assistant" to the expert (It was a very different company then the way). This time the fan in a window frame and tensioned with a value of 1.2 we have of course passed.

Since the second test was not in the doorway, was the first time the problem of poorly sealed door clear. This was spoiled and we felt a strong draft.

The explanation is as follows:
We wanted to have a three-piece door and, according to the manufacturer here A static profile in the works. This profile is Viebrock most sweeping away for now. Whether it is only for optical reasons or cost reasons, we can sometimes hang in the air. This profile has been included as Angel Tree, and without contradiction added later. The door closes now much better, is softer to the castle and does not wiggle more that way.

Thursday, August 3, 2006

Canada Driver License Template

tile tile work done


For today it is not much to report. Around noon, the tiler finished and cleared away their stuff. Tiles of each type (5 different) we have ever received a replacement package. I could still set a few pictures of grouted tiles, but that would be really boring ;-)

Thus we are back on schedule and have even been a rest day - morning!

Oh yes, HWR guess someone was there, who prepared the Assembly for the last window seat. It was somewhat filled and laid a foil / bonded. Supposedly did not fit the first window sill. Well, as I'm concerned!

Monday it is "fit railing" continues with "filler work" and as well as a construction manager appointment on Tuesday. According to the city do the work well sometimes open in the week, but nothing precise we do not know :-(

Wednesday, August 2, 2006

Citolspram And Overdose



... So I like the tiles. While we have chosen the classic among the Viebrock tiles, but if we look at it that way, we also know why they are so popular!

Yesterday morning there were still some details to clarify, with respect to the level before the bathtub to look like the shelves, edges, etc. All just little things, but I'm glad we 2-3 times day can stop by to clarify all these little things. So you can at least change something spontaneously. Spontaneously on site but some things look different than anyone imagined in the mind's eye during the sampling added.

I think it's great that this is not to say: "Do not go, we can not, must not". Until now, all spontaneous special requests have been implemented directly on the site (on the small official channels).

And yesterday was once again time construction manager. Our normal supervisor is also back from vacation ... and we also added the same again. Two times in a row, even if it was only last week the agency.

After three days are now ready to drill holes and have the following Leave. These pictures speak for themselves. The little black heap on the wall are soil samples were collected from each new tube.

For our evening short visit (about against 18-18:30 Clock), the tile is almost done. The first walls were grouted and we looked forward to the workday. Thursday nor the rest of the corners and then it's back home for the weekend. For this evening, the two guys already got the sausage out and we wanted to barbecue in the garden.

The joy was quite fast over when Sven asked when would they make the HWR. The eyes were getting bigger and they asked us where the should be for. After brief discussion, whether it would be a utility room or closet, it was clear that they had forgotten this space completely. The blueprint of this room was been declared as a storeroom, but clearly it should be tiled. The faces were longer and longer, the sausages marched into the distance and our utility room, which was to be abused for this moment as work and storage space for the tiler had again emptied, cleaned, swept and be roughened. With a very bad conscience because we have them messed up the closing time (which looked pretty hungry from ...) then we have very quickly made from the dust:-D